Point Lesson Results
Thursday, August 07, 2008
Powerful Point Lessons
I experienced one of those moments today with a group of my students (a rare case when this experience typically occurs just in one-on-one moments). I was leading a simple point lesson at lunch time with a small group of plant leaders from our Batesville plant. The topic was the classic spaghetti diagram. The spaghetti diagram is a simple map indicating the path of a part or person through a process. As you draw the travel path back and forth, up and down, etc. the lines can resemble a bowl of spaghetti noodles.
For a point lesson, it is best to focus on one small topic and keep it short, usually I target 15 minutes depending on the topic. Following the short explanation (using little or no PowerPoint slides), I have my students now try it. Learn by doing is the best way to understand. If done well and often, these point lessons can have a far greater impact than full blown kaizen events.
I asked the students to go to gemba (shop floor or office) to find a process of their choosing to map using the spaghetti diagram. I gave them a deadline of just the next 20 minutes. The group practically ran out the door to meet the deadline. I knew I would get a few good responses upon their return but I was not entirely prepared for what happened next.
At the appointed 20 minute deadline, my students started funneling back. Everyone was excited about what they discovered in just 20 minutes. People were comparing stories and looking over the discoveries of the others. Many of the students were shocked at how much travel they just witnessed. Plenty of ideas were being thrown out to make improvements.
With that, I asked them to please make those improvements as tonight’s homework assignment due by the end of the day tomorrow. After making these improvements, I asked that each of them sketch out an after kaizen spaghetti diagram and share it with the group.
In just a short, focused 35 minute session of learn by doing, we had over 20 processes targeted for immediate improvement. Pretty Awesome! I can’t wait to see the results tomorrow. It almost feels like I’m seven years old again on Christmas Eve. I'll let you know what I find under my tree tomorrow.
Tuesday, July 29, 2008
Top 12 FAQ about My CI
1. Who is involved in My CI?
Everyone is involved and encouraged to participate from CEO to temporary employees. We stress leading by example.
2. How do you announce the start?
After a few planning sessions, we conducted organizational wide training sessions to make sure every employee understood the need for this program, how it is different from a traditional suggestion program and how the process works. During this ½ hour training session, we officially announced the start of the program.
3. Is training really needed?
Yes. By investing the time, energy and dollars in these training sessions, we insure everyone gets the same information about My CI. It also sends a strong message that we believe this program is important enough to shut down production or use overtime for training.
4. When do you conduct the training?
We worked with the management at each site to plan the best way to get all the associates on all shifts through the training in a 1-2 day time period. Some sites required we train on overtime while others made time during normal working hours.
5. Who decides if the idea will be implemented?
We encourage the associate and their direct supervisor (team leader) to try the idea out first and determine if the idea works. Our My CI process is geared toward getting all the ideas implemented and keeping decisions at the lowest levels. The key is working with the team leaders on coaching skills to support the process.
6. Is it difficult to decide?
This has not been a problem when using the lean principles as a guide.
7. What if an idea fails?
In the words of my Japanese sensei to me when faced with a failure, “Please try again”.
8. How do you handle the implementation of the approved ideas?
We encourage ideas that can be implemented by the associates themselves. Sometimes we get ideas requiring some outside support from management, maintenance, tooling or even a supplier which turned out for us to be about 50% of the time. These ideas took a little longer to implement and we provided the support.
9. Do you have a designated maintenance team?
No. We use our regularly staffed maintenance team for support. We have learned from other companies that they have successfully formed designated kaizen support teams from hourly associates freed up from kaizen activities to help implement kaizen ideas. It sounds like a great idea that we may try out.
10. Do you post pictures of the implemented items for everyone to see?
Absolutely! A major component of My CI is employee recognition and sharing ideas that’s why we created our My CI Kaizen Wall of Fame in the plant where everyone can easily see all the ideas. At one plant, we hold a lunch meeting every Friday with the entire plant staff showing off the ideas from their area that week. We also added the ideas to our communication monitors throughout the plant and post them on our company wide intranet site.
11. Do you provide any incentives or rewards for the ideas?
We do not provide any special rewards or money for each idea, only recognition by posting the associates picture with their idea on our Kaizen Wall of Fame and public/peer recognition. We also encourage ideas that make their jobs easier and better which reaps benefits everyday. But this does not mean you could not add an additional incentives if that works in your company to increase participation.
12. Do you track the savings generated by the ideas?
No, we only track the participation level on a weekly basis. This metric is one way to reflect our company morale. We believe if we added the burden of tracking savings that we would create disagreement on how the savings are to be measured. The other reason is that putting a dollar figure to each idea might inhibit people from generating ideas because their idea did not save a lot of money compared to other ideas. Creating an environment to generate lots of ideas by everyone is more important than waiting to implement only “homerun” ideas.
Friday, July 25, 2008
My CI
That is not to say there is not employee involvement in our lean approach. Over the course of our long, lean journey to date, we have had some great success in involving many different employees in making improvements, especially on kaizen events. However, most of the involvement was from management. In addition to a lopsided management participation level, we have not pushed ourselves much beyond the manufacturing walls.
The good news is that we recognize this gap in our lean approach, laid out some countermeasures and started actively changing our ways. The most significant countermeasure we have launched is our “My CI” initiative.
From my lean manufacturing study tour in Japan courtesy of the fantastic JKE hosted by Gemba Research, I have learned how many Japanese companies promote, cultivate and embrace the simple kaizen approach implemented by all associates. The cornerstone of Toyota success is their improvement and suggestion system by all team members. This process is described in outstanding detail in the exceptional book “The Idea Generator: Quick and Easy Kaizen” by Bunji Tozawa and Norman Bodek. With these examples as a model, we have developed our own employee motivation and suggestion program called “My CI” which is short for My Continuous Improvement.
Basically, we have set up a process for employees to implement improvements or simple kaizen which are just simple ideas to make their jobs easier and better. These ideas are described as common and ordinary ideas that are within our control to implement in just a short time (like today). Everything is included from safety, quality and productivity improvements. If the idea can save one cent or one second, that is good enough.
Our goal is to reach a level of total employee participation across the entire corporation (manufacturing, corporate office, logistics, distribution and even sales) where each employee contributes 2 ideas per month. It is a lofty goal.
Thursday, July 24, 2008
Back to Blogging
Saturday, July 05, 2008
We the People
“We the People of the United States, in Order to form a more perfect Union, establish Justice, insure domestic Tranquility, provide for the common defence, promote the general Welfare, and secure the Blessings of Liberty to ourselves and our Posterity, do ordain and establish this Constitution for the United States of America.”
In reflection this Independence Day, our country was founded on extremely high principles and values. Our founding fathers envisioned a country that could rise higher in its purpose, standing for truth, justice, freedom, democracy, equality and tolerance. We proclaimed our lofting ideas in the Declaration of Independence for the world to see - that every person enjoys a right to life, liberty and the pursuit of happiness.
Over the course of our nation’s history, we have found that our noble ideas are simple in word but hard to live up to. We have not always acted in a way that is described in our own inspired words. The journey is difficult by we keep trying as a nation to follow this path.
Our lean journey is not unlike our nation’s journey. The high principles of the lean philosophy, like respect for people, are easier said than done. Respect for people is about treating others as we wish to be treated. Respect for people is focused on total employee involvement, team work, inclusion in meeting a higher purpose.
We the people and respect for people appears to go hand in hand. When we refer to our nation, we mean all our citizens, just like when we refer to our company, we mean every employee. Our employees are the company.
Sometimes we forget this and think of employees no different as our machines, to be used or discarded as needed all in the name of profit. Profit in itself is not evil however greed and power can blind us from our principles and values.
As we return back to work, take a moment to reflect on our nations founding ideas and be thankful for our freedoms. For those of us on our lean journey, look to our lean principles and ask ourselves how we can better live up to them. Most importantly, do we say we believe in respect for people but fall short in our daily actions and decisions? How much better could we build our company and our nation if we could improve our actions in line with our inspired ideas and principles? It all begins with “We the People.”
Wednesday, June 25, 2008
Words of Samuel Beckett
Samuel Beckett. Irish author, poet, Nobel Prize in Literature (1969).
Friday, June 20, 2008
Value in Value Stream Mapping
The little mistake we made was skipping the identification and mapping of our value streams. Even as it was pointed out by our lean sensei that we should do a value stream map, we did not see the value in value stream maps.
Our typical mindset was: What’s the big deal in doing a value stream map anyway, why can’t we just make improvements? We know what the problems are and don’t need to waste our time doing maps. We see waste now, just let us attack it. Aren’t we making improvements without needing these maps? Maps?..We don’t need any stinking maps.
Sure, you can make some improvements without value stream maps however we learned that not all our improvement activity led to bottom line results. What was worse, our improvements did not always add value to our customer. After a little humble reflection, we realized our lean efforts were nothing more than cost reduction and we were starting the stray off the path. What happened to reducing lead time and increasing customer value?
We were faced with another change in our thinking and took step back to learn about value stream maps. After several training sessions and just doing it, we began adding value stream mapping to our “way of doing” things. We still are not experts at value stream mapping but have experienced a nice boost to our continuous improvement efforts.
Where we found the most value in value stream mapping was being able to see and understand the whole process (value stream) where previously no one person ever did. We only knew our little sections of the process. This helped us look at optimizing the whole value stream instead of improving our sections, usually at the expense of the whole. We also started focusing on lead times as opposed to cost reduction. The maps also helped us prioritize our kaizen efforts aimed at making a bigger impact for our customer instead of just a shotgun approach. We now see our kaizen events as “Strategic Kaizen”. Finally, value stream maps helped us all agree on our current state and what our future state vision looks like. With this shared vision, our team began to move forward as a team.
If you have not begun using value stream maps yet on your lean journey, don’t just dismiss them as an optional step. There is value in value stream mapping.
Wednesday, June 18, 2008
AME Conference Promo
Monday, June 16, 2008
Air Kaizen

For example, at one of our recent kaizen events, we found that we are pushing air at one of our presses. In this process, parts are loaded onto a feed table to the side of the press while the machine is cycling. Once the press finishes its cycle, the completed parts are automatically pushed out of the press by the new parts being pushed in from a pusher. The only problem is the distance or gap between the staged parts going into the press and the press opening is over 24 inches. That’s a lot of air being pushed as the parts travel across the feed table before they actual enter the press.
The countermeasure for air muda at this machine is really pretty simple. With a little help from our talented maintenance staff, we made a new mounting bar and repositioned a limit switch for the pusher to close the gap to under 4 inches. The result is a 4% productivity improvement without purchasing a new machine or radically changing the method.
This machine was a bottleneck station and we were having a difficult time meeting our takt time causing an overtime situation. This simple kaizen along with some other improvements got us back to meeting takt time.
We found similar opportunities on other pieces of equipment throughout our operations resulting in 5-10% productivity improvements each time we did a little air kaizen. Take a critical look at your processes to see if you are in the air business. How many of your machines are set up to cycle through air before touching the actual material? Apply simple kaizen to the process and work yourself out of the air business.
Thursday, June 05, 2008
Emergency Cost Cutting Mode

It appears that 2008 is going to be a tough financial year for many companies due to economic woes, housing bubble busts, rising prices (oil and metal to just name a couple) and rapid consumer/market swings. When we go through these business cycles, it can be rough going as companies jump into their emergency cost cutting mode.
As a lean thinker, I try to learn from these cycles and try to act in a manner that is consistent with the lean philosophy. I also scan across the news reports to see what other business leaders are doing to add to my knowledge both the good and the bad strategies.
My first thought is that we should not be surprised by downturns in the economy. The economy is a cycle and we will always experience ups and downs. I find it mildly amusing and a little discouraging when I read about company leaders that publicly admit to be surprised by this downturn. Like a deer in the headlights, they proclaim that they didn’t see it coming.
Second thought, we face major business challenges every year, although they can and do change year to year. No big news here.
Third thought, we are expected to improve year over year to be successful or even just to survive. Continuous improvement should be a given. Again, no surprise for most of us.
So what actions should we take?
Looking across the business community, we can read plenty of announcements from company CEO’s declaring their action plans to deal with the economic crisis. Here is a list of what seems to be the most popular actions from mainly American companies.
1. Layoffs
2. Plant closings
3. Selloffs
4. Mergers (Under the theory that two poorly operating companies combine to make one better performing company)
5. Outsourcing
6. Re-organize
7. File bankruptcy
We can add to this list with more internal actions that don’t always make the headlines like:
8. Cutting travel
9. Cutting capital spending
10. Delay paying invoices
11. Hiring freeze
12. Cutting or eliminating bonus
13. Wage freeze
14. Cutting R&D budget and projects
15. Increase marketing
16. Cutting the IT budget
17. Across the board budget cuts (the lazy management choice disguised as sharing the pain)
The sad part in the last several decades of my business life is that many of these popular actions do not require an economic crisis to execute them. Even during the upswings in our business cycle, many of the same items list above are regularly used to increase profits.
But do they work? Are there other options?
According to the Daily Yomiuri, when asked “What will Toyota do to cut costs?” Toyota Motor President, Katsuaki Watanabe answered, “We’ve started what we call “Emergency Value Analysis Activities”. We’ve formed teams to review every single part and component over the next six months to determine how to improve design to reduce production costs further.” He also added,”Some employees still lack awareness of these activities, but we plan to develop our human resources in tandem with this effort.”
Hummm…Dramatically increase kaizen activities through design and develop people.
Which actions are short term thinking and which are long term thinking? Which emergency cost cutting mode do you think is the best choice? Would some combination of both short term and long term actions be better?
Tuesday, June 03, 2008
The Kaizen Cycle Continues
We just start the kaizen cycle again…in the same area …even before the 30 day follow up.
In our kaizen event report out, the team shared a typical 30 day homework list that we limited to key items to be completed in only two weeks. We ended the homework list by adding the request to run another kaizen event with the same team to continue our kaizen efforts to reach the targeted goals.
The cool thing about this team request was why the kaizen team wanted to do another event so quickly. It was not just to hit the goal that we fell short but rather that the team had several great ideas to make improvements and didn’t have time to try them all out in the first event. They wanted more time to experiment with these ideas and make it work. This kaizen team “SEES” the opportunities and has the “PASSION” to act. So what do lean leaders do in cases like this?
We let them kaizen!
As lean leaders, one of our main responsibilities is to provide the environment and support for kaizen which is exactly what we did in this case. Our kaizen team will get another chance to experiment with their improvement ideas in two weeks. The kaizen cycle continues.
Saturday, May 31, 2008
Relentless Pursuit of Kaizen
It is the easy path to postpone, re-schedule, delay or even cancel planned kaizen efforts when a barrier stands in the way. These barriers could range from available manpower, down equipment, hot orders, new priorities or even just a higher level of daily chaos. Any and all of these barriers quickly pressure us into pushing off kaizen and jumping into our firefighting mode.
Jumping into firefighting mode was literally what happened to us this past week a mere 30 minutes before our scheduled kaizen event was to start. On Tuesday, at our Vicksburg, Mississippi wood processing plant, the fire alarms blared as we safely evacuated the plant. Thank goodness, no one was hurt and the fire damage was minimal.
The fire just happened to be located at one of the machines in our targeted kaizen event area which had us quickly evaluating what to do. On top of that, we lost one scheduled team member and expected to lose some critical maintenance support as a result of the fire. Our planned kaizen event was in jeopardy of being delayed or cancelled.
This is a point that we could have taken the easy path and no one would have harshly criticized us for pushing off the event until another time. We also considered going to another area in the plant however we did not have any pre-work for another area completed and thought that would be a low success decision. After a short meeting, we came to a decision on a course of action.
We decided to relentless pursue kaizen as planned in our target area. By pulling the team together, we worked around the down machine while it was quickly being repaired which ended up only taking a day to fix. Despite the fire, lost team members, production schedule changes due to the fire and machine downtime, we still found a way to kaizen. The results were not as high as we expected yet we still improved productivity on this line by 28%.
Don’t let barriers lead you to the easy path and delay improvement efforts, find a way to kaizen. If you do this, you are starting to change your mindset from kaizen being an activity or event to kaizen becoming a way of life.
Friday, May 23, 2008
Lean, Reliable and Lubed 2008 Conference Experience
This week I attended Noria Corporation’s Lean, Reliable & Lubed 2008 Conference in beautiful downtown Nashville, Tennessee. My hat’s off to the staff at Noria for a simply outstanding job delivering a world class event. Special thanks to Paul Arnold, Editor of Reliable Plant Magazine for hosting the Lean Manufacturing program and inviting me to speak about our lean journey at Batesville Casket Company. And I wish to express my deepest gratitude to Drew Troyer, CEO of Noria Corporation, for taking time to personally help me find the right location (after a room change) for my scheduled interview even though this occurred just barely 20 minutes before he gave his keynote address. What an outstanding example of customer focus and unselfish service to others!
Although the majority of the over 1,500 in attendance were primarily drawn to the Reliable World and Lubrication Excellence segments of the conference, I was excited to see an overall interest in lean manufacturing from many of the participants. More and more companies are exploring the lean approach and judging from the representatives in attendance this week, it appears that they are making an effort to learn as much as possible based on all their excellent questions and participation.
It was a great conference to hear and discuss many lean topics from well know lean presenters and a few new ones like myself. The best way I judge a conference is if in the middle of several of the presentations, I have this insanely strong urge to jump out of my seat to improve our processes based on what I was learning. This happened several times to me during this conference and I wanted to rush back to Batesville Casket to try some new ideas ASAP. I can’t wait for our upcoming kaizen event on Tuesday.
For me personally, I had the wonderful opportunity to meet face-to-face for the first time with my friend, Karen Wilhelm, writer extraordinaire for AME/Target and her lean blog, Lean Reflections. Karen has some wonderful insights on the world of lean and I truly look forward to reading more from her in the future. I also had the great pleasure of meeting two new friends, Ross Robson, Former Executive Director of the Shingo Prize and Mike Thelen, Lean Facilitator for Hub City. Both gave great presentations filled with wisdom and passion for continuous improvement along with many points adding to my lean knowledge. Mike has led some great improvement efforts and sustained some excellent lean practices like their daily gemba walk at Hub City. And thanks Ross for the $$ for winning your quote challenge. As seen in the picture above, (from L to R: Ross Robson, Mike Thelen, Karen Wilhelm, and me-Mike Wroblewski), we had just finish a great lean discussion over lunch.
As an added bonus, I had the opportunity to meet the great racing legend and past Indianapolis 500 race winner, Mario Andretti. What an unexpected pleasure to meet such a legendary race car driver, fierce competitor and true gentleman.
Thursday, May 15, 2008
The Power of Leverage

A lever helps us multiply force to gain a mechanical advantage, or more simply, the ability to do more with less. With the length of the lever and a properly placed fulcrum (the support point for the lever to raise or move), we gain an advantage in our effort.
Based on this power, not only can we leverage our effort, we can leverage practically anything like money, knowledge, and contacts. Leverage make things works for us and we get more output with less effort. As simple as this notion sounds, many of us tend to stumble over what this means and how it works. Sometimes we are quick to take effort away and expect more results without changing the method or tool which only results is in us working harder. From a lean application, the power of leverage to do more with less is deeply embedded in our thinking.
What does Toyota use as leverage? At a glance, there are many ways Toyota creates leverage including their quality, reputation, brand name, cash flow, innovation and design. But their greatest asset is their people and Toyota uses this strength as their largest lever of all.
One powerful example of Toyota’s leverage with their people is by teaching, coaching and expecting everyone to be problem solvers. More problems are solved in a shorter period of time. By comparison, many companies fail to match Toyota’s problem solving skill not in intelligent levels but because we making problem solving an exclusive activity of managements and engineers.
People create, innovate and experiment. People learn and think. People create value. Robots and machines do not. Like Toyota, we say that our people are our greatest asset yet we are also quick to cut headcount to make our quarterly or year end numbers. With each headcount reduction and layoff announcement, we proclaim a cost savings. But all we are really doing is shorting our lever.
BONUS:Check out this cool example of the power of leverage by Wally Wallington.
Workplace Mantra: We MUST Stay Busy
It never fails, when anyone is being observed they will do anything to stay or look busy. There seems to be this powerful unseen force in nature that tends to make us feel very uncomfortable to be idle when at work especially if someone is watching. The resulting action is for us to do something (anything) which is better than doing nothing. This pressure to “do” is magnified if the people around us are busy working or the higher up the ladder the person watching us is employed. It is worst if the person doing the observation is from the corporate office.
The problem with this stay busy work ethic is that we tend to fill our time with typically non-valued added tasks. Overproduction is one of the most common results. More importantly, it hides the problems of imbalance and work flow. Remember, motion does not equal value.
For example, we combined some operations to point of use on one of our main assembly lines in our Chihuahua kaizen event. In our old process, we had built up some work in process (WIP) inventory. Through our experimentation, we proved that the WIP inventory was no longer needed so we were trying to consume it.
I was standing next to the associate that worked in this cell and just by me observing him for an extended period of time, he felt compelled to follow the workplace mantra. He began building ahead just to stay busy. It took a surprising amount of effort and coaching to get him to understand and believe that it was ok to be idle. We also explained to him that by working ahead, he was also “working harder” and increasing his cycle time by taking extra steps and double handling. Finally, we were able to eliminate the WIP and get back in flow.
As a helpful hint, we suggested a list of more value added activities to could be done during this idle time rather than overproduction. This list included some equipment PM, workstation 5S or even thinking time to make improvements to their job. Yes, thinking!
So next time you are in gemba, look for signs of the workplace mantra in your operation. Use it as an opportunity to teach a better approach then joining in the crowd chanting…We must stay busy.
Thursday, May 01, 2008
Value Stream Maps are Muda
The entire value stream mapping process, regardless of accuracy and number of strategic kaizen bursts identified, will just be a waste of time if you do not include an implementation plan to get to the future state and then actually act on this plan. The goal of the value stream mapping process is to achieve the future state.
Tuesday, April 22, 2008
Earth Day 2008
The 5S approach is just one example. Teach the basics of 3S (Sort, Straighten and Shine) and ask them to be repeated daily to achieve 5S. Explain that this is not a Spring Cleaning program to be completed once a year but a daily way of life. Encourage a daily 5 minute routine for everyone although you certainly can do more. And, focus not so much on cleaning but making a workplace organized to immediately see problems at a glance, any abnormality from standard.
Finally, while it’s great to see pictures and hear stories about the great volunteer work to clean up all the trash found in parks, rivers, and lakes, we should also follow the 5S lessons to look for the source of “dirt” and put in countermeasure to prevent it from getting “dirty” in the first place.
Now that we see we can make an effort on at least one day a year, let’s apply the kaizen approach and not wait until Earth Day 2009 to do anything else. Remember, the better approach to sustaining change is through gradual, small frequent improvements everyday.
Earth Day should be everyday, nothing special, no banners, slogans or t-shirts. Our actions to improve the environment should just be part of our daily way of life.
Saturday, April 19, 2008
Value Stream Communication
We focus not only on the quality and quantity of information but the speed of communication from the shop floor to management and back. We look of opportunities to improve communication including making sure we have solid two-way communication to battle the common complaint of only having one-way communication channels.
In our lean world, we understand the importance of information flow and communication. In fact, our value stream maps are constructed to focus on both material and information flow making opportunities visible in both areas.
But if we examine our value stream map process, we may find that is not always true. How many of us focus more on the material flow while constructing our value stream maps and give little attention to the information flow? Why? Is information flow harder to see? Is it that material flow has easy dollar savings tied to improvements in this area over information flow?
One of the most important, yet overlooked, areas of improvement in communication in our value stream is the direction of the flow of information. Just look at your value stream map. Are there more information flow arrows moving up and down (vertical) than information flow across the value stream (horizontal)? It is critical to look at improving communication across the value stream or this horizontal direction. This can reduce errors, remove non-value added gates, and speeds up the flow where it is needed most.
If you take a look at all our technology advances and communication improvements over the past few years, in which direction are we focusing on? Is it more the vertical direction (bottom-top-back down) or is it horizontal (side-to-side)?
This is not to say top-down communication is not important, just that we tend to ignore the very important horizontal communication path. Improving our horizontal communication is probably the most critical missing link we have today on our lean journey.
As an example of the power of horizontal communication, I can recall one event that occurred several years ago at another company. As with most typical manufacturing operations, our process was set up in a traditional manner, assembly followed by 100% inspection. The inspector looked over and tested the products, passed on good products and pulled non-conforming products off the line. The inspector, following procedures, marked the products and recorded that data. This information was passed on to the Quality Manager then on to the Plant Manager. The data was reviewed in the next day’s staff meeting with the supervisors with the action item to deal with it. And certainly, throughout the day, this information could be seen directly only if the Quality Manger, Plant Manager or Supervisor walked over to the inspection station.
What do you think about this information flow? How would you improve it?
Seeing that we lose valuable time between error detection and error countermeasures, we keep the information flow the same except for one major change. We directed the inspector to stop the line and notify the supervisor immediately with each problem. We also added that the inspector could stop the line and walk over to the most probable source of the problem and directly inform the employee of that process about the problem. At first the Plant Manager was not happy about all the line shut downs. But over time, we saw an amazing reduction of errors which ultimately improved productivity. Isn’t that what we are really after?
Take a quick walk to your gemba and look at the communication flow. Look for any ways to improve horizontal flow. How far apart are the associates in the value stream from each other? Can we change the flow to move them closer together? Can all associates see the proper information boards? Ask each associate what information they need and how fast is it getting to them. Ask each associate how we can improve the flow of information to them, get their ideas. With focus and creativity, improvements in the horizontal flow of information will greatly improve your value stream.